STORES
Raw material store has following sections:
Receiving Bay - unloading and preliminary inspection of incoming material is done here. Sampling and Dispensing unit is available here.
Untested Raw Material Store:- Raw material is kept here till the test report is not received form Quality Control
Tested Raw Material Store:- After Quality Control Report passed raw material is kept here. One room has AC facility in which Vitamins and other sensitive raw materials which required room temperature are kept.
Rejected Raw Material Store :- Separate area is provided to keep the failed raw material.
PACKAGING STORE
Packing material store has racks to keep the cartons and labels. Separate area is provided to keep the corrugated boxes.
FINISHED GOODS STORE
Sufficient area is provided for the storage of finished goods.
Following facilities is also available at the plant:-
- DG set
- Work Shop
- Control Pannel
- RO Water System
- Air Compressor
- Drain water treatment plant
- Rain water harvesting
|